← Back to Blog

Calibration Plate Installation & Adjustment: Complete Guide

Calibration plates are precision components that control sintered stone thickness. Installation and adjustment quality directly determines product dimensional accuracy. Incorrect installation can cause thickness deviations beyond tolerance, leading to entire batch rejections.

1. Pre-Installation Preparation

2. Installation Steps

Step 1 — Positioning: Place the calibration plate between the top and bottom rollers, center it, and pre-tighten with mounting bolts.

Step 2 — Parallelism Calibration: Use feeler gauges to measure the clearance difference between the plate and rollers. Adjust left and right mounting bolts until the difference is ≤0.03mm.

Step 3 — Thickness Measurement: Insert standard thickness gauges (2mm/3mm/6mm/9mm/12mm) and confirm readings within ±0.1mm of standard values.

Step 4 — Trial Run: Run empty for 10 minutes, then re-measure to confirm parallelism stability under thermal conditions.

3. Adjustment Considerations

Critical: Hot-state calibration must be performed at production temperatures (typically 180-220°C). Cold-state readings will have a 0.05-0.15mm deviation when the machine heats up.

4. GDNOS Calibration Plate Advantages

GDNOS calibration plates use high-strength alloy steel with precision-ground surfaces achieving parallelism tolerance of ±0.01mm, effectively improving board thickness consistency and reducing scrap rates.

Need technical support? Contact GDNOS: +86 135 1270 0969

Brand names such as SACMI, KEDA, and HLT mentioned on this website are used solely to indicate product compatibility. GDNOS is not authorized by, affiliated with, or endorsed by these brands.

Brand names such as SACMI, KEDA, and HLT mentioned on this website are used solely to indicate product compatibility. GDNOS is not authorized by, affiliated with, or endorsed by these brands.